Home
»
Ruud Boiler Zone by Pump
divider
The Master Pump Panel is utilized when 2 to 4 thermostat zones are required in the system. The panel extracts the heated fluid from the boiler and processes the heated fluid to the Emitter Circuit. Boiler and Emitter circuits have hydraulic separation for independent flow adjustments.
Pair with a pump zoning panel based on the number of zones needed.
divider
Number of Thermostats
Max Water Temperature
Max BTU's