Home
»
HS115Plus Zone by Pump
Zone by Pump
HS115Plus Gas Boiler w/ HSPS120MPL Master Panel and Zoning Panel
divider
The Master Pump Panel is utilized when 2 to 4 thermostat zones are required in the system. The panel extracts the heated fluid from the boiler and processes the heated fluid to the Emitter Circuit. Boiler and Emitter circuits have hydraulic separation for independent flow adjustments.
This system is used with a low temperature boiler and tubing-in-concrete emitter.
Pair with a pump zoning panel based on the number of zones needed.
divider
2-4
Number of Thermostats
140° F
Max Water Temperature
120,000
Max BTU's